Projects Successfully Completed
Product Development
( Independent Consultancy )
Food Consultant
Apr 2022 – Present
- Product Developments in Culinary Range
- Efficiency Improvement in Existing Line
Manufacturing Outsourcing Network Establishment
( Independent Consultancy )
Food Consultant
Nov 2021 – Present
- Identified, Approved Commercially, Technically Multiple Products Manufacturing Outsourcing sites
- South India Coconut Water Filling – 2 Sites
- West India Fruit Juice Filling – 1 Site
- North India Dairy Products Manufacturing – 1 Site
- North India Plant Based Pdts. Manufacturing – 1 Site
Project Feasibility Report
( Independent Consultancy )
Oct 2020 – Nov 2020
- Feasibility Report for Mayo, Salad Dressing & Tomato Ketchup Mfg.
Manufacturing Outsourcing Network Establishment
( On Job )
Regional Manager
Dec 2018 – Oct 2021
- Identified, Approved Commercially, Technically Dairy Products Manufacturing Outsourcing sites
- West India – 4 Sites
- North India – 4 Sites
Hydrolyzed Plant Protein Extract
( On Job)
Project Manager
Feb 2009–Apr 2010
- Capacity Expansion from 4.8 ton to 9.6 tons per day of Peanut Protein Extraction Plant
- Installation & Commissioning of autoclaves, filter presses, concentrators, vacuum ovens, hammer mill, rubber coated tanks, Acid storage & dosing tanks
- Segregation of dry & wet areas
- Dehumidifying Room
Brown Field Factory
( On Job)
Project Manager
Oct 2017 – Feb 2018
- Brown Field Factory for Mayonnaise, Dressings, Tomato Ketchup & Vinegar in Algeria
- Installation & Commissioning of Batch Processing
- Azo Liquids – 1
- Mobile Tanks
- Installation & Commissioning of Glass Bottle Line & PET Bottle Filling Line – 120 B.P.M
- Bottle Air Rinser
- Bottle Filler (Jar, Bottles)
- Bottle Capper
- Bottle Sleever
- Induction Sealer
- Bottle Labeller
- Neck Sleever
UHT & Tetrapack Line Establishment
( On Job )
Project Manager
Jan 2017 – Feb 2019
- Tetratherm Flex100 – Upgrading retrospectively for High Viscosity Whipping & Cooking Creams
Direct Steam Injection Retrospective Update
( On Job)
Project Manager
Dec 2014–May 2015
- Upgrading Existing Batch Process – Fryma Koruma Maxx D200 retrospectively for Direct Steam Injection heating vis a’ vis indirect heating
- Reduced batch cycle time by 15 minutes & Clean-in-place time by 30 min
Culinary Division Capacity Expansion Project
( On Job)
Project Manager
June 2014 – Jan 2016
- Capacity Enhancement from 2500 T to 5000 T per month
- Installation & Commissioning of Batch Processing
- Fryma Koruma Maxx D 200 – 2
- Terlet Cookers – 4
- Mobile Tanks
- Weighing & Column Dumping Systems
- Installation & Commissioning of PET Bottle Filling Line – 120 B.P.M
- Posimat – Bottler Unscrambler
- Gherri – Bottle Air Rinser
- Gherri – Bottle Filler (Jar, Bottles)
- Zalkin – Bottle Capper
- Graham – Bottle Sleever
- Enercon – Induction Sealer
- Newtec – Bottle Labeller
- Metler Toledo – X-ray machine
- Cermex – Carton packer
- Fezer – Vacuum Lifter & Manipulators
- Carton Weighing Systems
- Metal Detectors
- Automated CIP System
- Cryovac Machine – Pillow Pouch
- Van Meurs – Bag-in-Box machine
- Bundling machines – L bar, Shrink tunnels etc.
- Cap Wad Punching Machine
- Universal Machines – Sachets & Pouches
- Dip Cup Machine
- Index 6 – Gallon Filler & Jerry Can Filler